PunchLink by IndustriaLink Request a demo
4 SCENARIOS · 4 SECTORS · ILLUSTRATIVE STORIES

Use-case scenarios

Four illustrative scenarios, built from typical industrial situations, to show step by step what PunchLink changes. The companies, people and figures are fictitious; these are not customer testimonials.

STEEL
Illustrative scenario
REVAMPING · 4.2M EUR · STANDARD

Steelworks — continuous casting line

Cooling system revamping, 11 months, 6 contractors, 3-week production shutdown. What PunchLink would change, step by step: in this scenario, zero days late on the shutdown.

Read in French →
FOOD
Illustrative scenario
EXTENSION · 1.8M EUR · STARTER

Organic food plant

Food line extension and 800 sqm cold room. In this scenario: IFS audit with 0 NC, line started in time for the asparagus campaign.

Read in French →
CEMENT
Illustrative scenario
DECARB · 8.5M EUR · PRO

Cement plant — decarbonisation

SRF substitution decarbonisation, 14 months, 8 contractors + 6 third-party bodies. In this scenario: 100% of ADEME milestones met.

Read in French →
BIO-BASED
Illustrative scenario
REVAMPING · 2M EUR · 8 TCE PACKAGES

Bio-based insulation manufacturer

Two neighbouring plants, two ways of running the job: PunchLink versus Excel + WhatsApp. Handover, punch list and as-built dossier compared, step by step.

Read in French →

Full scenarios available in French at /histoires/