Industrial As-Built

Industrial as-built dossier
in continuous compilation.

The As-Built Dossier should never arrive late. PunchLink compiles it continuously, with integrated CODAP/ATEX/ICPE standards and Anthropic AI to suggest missing documents.

PunchLink Direction View — screenshot of an industrial project in progress: overall progress, budget, reserves, DOE, delayed phases

Live screenshot — PunchLink Direction View on an industrial project in progress (~6 M€, 12 contractor lots)

French industrial DOE in numbers

On French industrial construction sites, the DOE arrives on average 3 to 6 months late compared to scheduled completion. This is a statistic that anyone who has managed a revamping or industrial extension project recognizes immediately.

Direct consequences:

On a 5 M€ construction site, this delay costs on average 50 to 150 k€ — a hidden cost that appears in no project reporting.

Why the DOE arrives late

The reason is not team incompetence. It's tooling:

PunchLink approach — continuous compilation

PunchLink reverses the logic. The DOE is not a project end-of-phase deliverable, it is a living tracking dashboard throughout the project.

Step 1 — Auto-loaded reference framework

At project start, PunchLink determines according to sector (steelmaking, chemicals, pharma, energy...) and project type (new construction, revamping, extension, maintenance) the applicable regulatory frameworks. Documentary obligations are pre-loaded by article category.

Step 2 — Purchase order triggers obligations

Each purchase order placed with a contractor automatically triggers associated documentary obligations. Example: EN 13480 piping order → automatic requests for: material certificates, approved welding reports, NDT reports, revised ISO plan.

Step 3 — Real-time tracking dashboard

A dashboard accessible at any time shows:

Step 4 — AI suggestions for missing documents

Anthropic Haiku 4.5 AI integrated into PunchLink analyzes article types already documented and suggests likely missing documents. The project manager confirms or rejects in 1 click, the request goes automatically to the right contractor.

Step 5 — Automatic daily reminders

Each day at 7am UTC, a cron job sends an email to late contractors (LibreTranslate auto-translates in their language). No one forgets. The client does not do the follow-up themselves.

Step 6 — Final export in 1 click

At completion, the DOE is already at ~95% observed completeness. The certified Word export happens in 30 seconds, with integrated photos, multilingual technical glossary, and automatic table of contents.

Natively integrated reference frameworks

PunchLink automatically loads applicable regulatory frameworks according to your sector:

Anonymized concrete case — French steelmaking industrial

On this 6 M€ steelmaking project, the DOE was at ~95% observed completeness on completion day, versus 40-60% market average. No 3-month catch-up period post-delivery. No teams mobilized after next startup.

Estimated financial gain: 30 to 50 k€ of hours saved + 100 to 200 k€ of risk avoided (penalties, service start delays, disputes). For a license at 1,900 €.

Safety helmet placed — end of industrial construction site
The day the site manager hands over the keys, the DOE is already at ~95% observed. No 3-month catch-up — no blocked retained payments.
Continue reading

Compare PunchLink to your current tool

30 minutes of personalized demo on your type of industrial project. No generic presentation — we start from your real context and the tool you use today.

← Back to PunchLink main page

DOE by work category PunchLink: selection of mandatory documents by lot, CODAP, EN 1090, ATEX, CODETI frameworks

Pre-wired industry frameworks

For each lot, the list of expected DOE documents is filtered by applicable framework: CODAP for pressure equipment, EN 1090 for steel frames, ATEX for explosive areas, CODETI for piping. The client selects at project start — everything else is automatic.

AI Unified Dossier PunchLink with automatic multi-format analysis: PDF, DOCX, XLSX, PPTX, DWG, DXF, IFC, images, ZIP — patent pending

Single AI drop — proprietary method

Drag and drop a document — any document: PDF, Word, Excel, PowerPoint, DWG/DXF plan, BIM IFC model, site ZIP. AI analyzes, classifies, routes to the right module with a confidence score. L2V SASU proprietary method, patent pending with INPI.

Anonymized use case · Real data

Biosourced insulation manufacturer · 2 M€ TCE · 8 lots

Two neighboring industrial projects, launched 3 months apart in the same region. One managed on PunchLink, the other on Excel + WhatsApp. Here is what we observed after completion.

✓ With PunchLink
  • DOE delivered in 2 weeks (instead of 3 months average market)
  • 92% of reserves cleared in 14 days post-completion
  • Advanced startup by one day on scheduled date
  • Clean start-up, zero production stops in month 1
  • No contractor payment disputes
✗ Direct neighbor · 2.5 M€ · Without PunchLink
  • 3 months after site completion to validate reserve clearance and End of Work Dossier (DFA) receipt
  • Startup delayed by 3 weeks on schedule
  • Multiple production stops in months 1-3 — breakdowns due to remaining uncleared reserves
  • APAVE inspection stop for major non-compliance not detected at completion

Anonymized use case inspired by real industrial situations observed in the same region in 2025-2026. Company names withheld for commercial confidentiality reasons. L2V SASU proprietary method — patent pending.

🤖 PunchLink AI — Control in natural language

Available since May 2026. Connect Claude, ChatGPT or GitHub Copilot to PunchLink. Add-on €49/user/month.

Complete guide →